Every organization has a constraint—one bottleneck that limits everything else.
We find your constraint and redesign the system around it. It could be in operations, projects, or decision-making.
Common Example: The Project Overload Trap
Too many projects, too few people. Everything urgent. Start them all now.
Here's the real problem: Your constraint resources—team leaders, architects, or key decision-makers—are drowning in context switches. They can't accelerate anything. Tasks drag.
The fix: Map your project types. Design capacity-limited lanes for each type. Control what enters when. Different project types need different lanes.
We prove it in 10 minutes with your actual team. High-WIP vs. Low-WIP. Same work, different approach. Teams consistently finish 40-50% faster with low-WIP.
Then we build your system: Map projects. Design lanes. Set limits. Prepare projects before launch.
Result: 25-40% faster delivery. Same team. Predictable timelines.